Typical Production Sequence for Marcellus Shale Gas Operations

  • Introduction: 1-2
  1. Site prep and earth moving equipment: 3-27
  2. Drilling vert & horiz-overview: 28-47
  3. Well casing install and cementing during drilling: 48-63
  4. Completions Hyd. Frac. Process-overview: 64-77
  5. Frack tanks; 500 Barrel wheelies; impoundments: 78-100
  6. Hydraulic Frackturing pumps and mixers: 101-117
  7. Sand cans–sand  kings–sand castles: 118-135
  8. Frackturing Chemicals; trucks & totes: 136-144
  9. Wells put into production–flaring; overview; well heads; storage tanks;: 145-165
  10. Well pad completed; Production Separators; VRU: GPU’s: 166-179
  11. Miscellaneous and multipurpose trucks: 180-197
  12. Pipelines & Compressors: 198-224
  13. Waste disposal trucks & process: 225-245

anotationNote: If you click on the page number in the toolbar of the slideshow below you can type in a number to go directly to any page. If either of the symbols at the right appears in the upper left corner of the slideshow you can hover on it for additional information.  If you use the full screen option you may want to zoom out (-) to reduce the width till the entire slide is visible (so no vertical scrolling will be needed when clicking from slide to slide).

OVEC's special collection libraryNov 18 2021  Hoots and Hollers
OVEC Closing Doors
Nov 4 2021  Hoots and Hollers
OVEC Co-Directors Tonya Adkins and Vivian Stockman Retiring
Sep 21 2021  Hoots and Hollers
Fact Sheet: Carbon Capture and Storage and Carbon Capture and Utilization
Sep 1 2021  Action Alert
Do You Know Someone Affected by Fracking?

The Author

Bill Hughes

Send this to a friend